Previous chapter:
Chapter 207: The Arrival of the Private Aircraft
Next chapter:
Chapter 209: The Unexpected Visitor
PREVIEW
... the inaugural flight of Michael’s Boeing 787 Dreamliner. The captain, with a clipboard in hand, meticulously checked off each item on the pre-flight list. Nearby, technicians conducted final inspections on the aircraft’s engines and avionics, ensuring everything was in optimal condition.
"Alright, Mr. Reyes," Heath called over, waving him closer. "We’ve filed the flight plan with the local aviation authority. Our route to Cebu is logged, and we expect clear skies most of the way. The de ...
YOU MAY ALSO LIKE