Previous chapter:
Chapter 532 Large passenger plane engine test run
Next chapter:
Chapter 534 continue planning
PREVIEW
... successful, and then He Gui began to check various data.
The time is gradual, mainly depending on the parameters of the engine, temperature, oil circuit, etc., the reason for this test run.
It is to prevent problems and instant damage, and it is not easy to find the cause. The chance of this thing breaking down is too high.
The place for the whole test is basically ventilated from front to back, with a pool at the back, but there is a shelter on the top.
After severa ...
YOU MAY ALSO LIKE