Previous chapter:
Chapter 202 Start construction of aircraft carrier
Next chapter:
Chapter 204 London International Defense Exhibition
PREVIEW
... ship and the natural gas ship gradually finish, and then waiting for the United States to bring the dismantled gantry crane over. As for the 400,000 For the time being, I really don’t care about the ton-level dock. After the gantry crane is transported, it will be installed first, and then I will dig out a dock later when I have free hands.
The missile boat project is still being manufactured in the small dock, but every time I see Zhao Ling, I seem to see a special look on her face.
YOU MAY ALSO LIKE


























