PREVIEW

... e Davids have to pay 600 million US dollars in liquidated damages. This amount is quite huge, so the Davids can't bear it. .

Although the early warning aircraft can no longer be sold, it is still possible to disassemble and sell the technology inside. By selling the technology, part of the liquidated damages can be offset, so that the loss can be reduced. After all, the Davids are the most business-oriented nation in the world. .

  For example, for the production of this T/R compon ...

YOU MAY ALSO LIKE
MTL - The Analects of Righteous Father’s CollapseChapter 235 Loyalty
 310.9k
4.8/5(votes)
ComedyDramaFantasyRomance

Jiang Liu lost his father at the age of three. When he turned five, his mother decided to run away with another man. At the age of fourteen, he sent off the only relative he had, his grandfather, before carrying a small amount of property and stepping into the big dyeing tank called society.
He was stingy, selfish and absolutely disgraceful. Except for breaking the law, he accumulated all the bad habits available to the mankind. Yet, such a man, after an unexpected death, was bounded by a silicon-based creature called the righteous father’s system. Since then he started his magnificent career in the world system.

World 1: On the ultimate evolution of unquestioning filial piety;

World 2: The man who loves to boast;

World 3: The search for the second spring for ones own mother

World 4: Good father

World 5: The self-cultivation of a national husband

World 6: Acrobat

World 7: Divine stick

World 8: My home has a baby egg

World 9: The correct way of wearing the green hat

World 10: Tremble, you scum man

World 11: An angel who doesn’t like to talk

World 12: The rebellion plan of a martyr

After several worlds went by…..

Righteous father’s system 001: [Shivering], I wonder if I still have time to change my host.

- Description from Novelupdates

MTL - Man Huang Feng BaoChapter 695 Wild end
 62.8k
4.5/5(votes)
ActionAdventureFantasyHarem

Heaven Concealing Great Sage Xie Chuan was plotted against by his enemy. Trapped within the God Burial Valley, he found a supreme martial technique hidden in a tomb called Demon Refining Heaven Swallowing technique.

Millions of years after the betrayal, reincarnated in a direct disciple’s body belonging to a small sect named Cloud Mist Sect, Xie Chuan finally broke out and escaped from God Burial Valley.

“In my previous life, I had only concealed the heaven with my hands. This life, I want to refine demons and swallow the heaven!”

The heaven swallowing expert who walked out of God Burial Valley was just born!

- Description from Novelupdates

Dear Mr. ShiChapter 876 - Training Fall in Love with Me 6
 2.4k
4.5/5(votes)
RomanceSlice Of Life

Shi Yuhan is the most heartless and evil human Song Qinghuan has ever met. He's arrogant, sharp-tongued, ruthless, and heartless towards her. Yet, he asks (read threaten) her to marry him and she has no choice but to agree. She needs to get into the Era Group to investigate her elder brother's whereabouts.Will her sacrifice be worth it? Will she be able to find the truth of her elder brother's disappearance? Will Shi Yuhan continue tormenting her? What's his motive?

Lord of Mysteries 2: Circle of InevitabilityChapter 1180: Author’s Afterword
 241k
5.0/5(votes)
MysteryPsychologicalSupernaturalAction

Lord of the Mysteries, part two.

In 1368, at the end of July. Bloody scarlet will descend from heaven.