PREVIEW

... Because it lacks a foundation," the Peddler explained. "To give birth to a House Spirit, a house needs to be rooted in a place, absorbing Spiritual Energy. This house is ever-shifting. It goes wherever the Brass Key goes, so naturally, it can’t take root."

"Without a House Spirit, can it still be used for cultivation?"

The Peddler, pinching his chin, said, "It definitely won’t work for advanced levels, but it’s no problem for beginners. Maintaining daily foundational cultivation ...

YOU MAY ALSO LIKE
What Should I Do if the School Bully is Interested in MeChapter 126 - Extra 7 – I'm a Pure Zero, Seme (Lin Che x Hao Meng) [End]
 7.7k
4.6/5(votes)
YaoiRomanceSchool LifeComedy

Ji Liao was particularly distressed lately. He had been “sexually harassed” (confessed to) for no reason (out of nowhere). Moreover, the other party was a man! Never mind that it was a man but it was well-known *class grass.

Draconic Pets Evolution SystemChapter 252: The Living Dead City
 938
4.0/5(votes)
ActionAdventureFantasySupernatural

Ryuk’s life in the forsaken Grade E city was bleak, but it truly shattered when a Knull raid took his last family and left him for dead. On the brink of despair: [System Activation Complete.] [Congratulations, Host has awakened the Draconic Pets Evolution System!] [Welcome host, to the path of domination.] Thrust into Endearth, a shattered mirror of Earth teeming with mythical creatures—vampires, werewolves, cosmic gods—and the unstoppable Knulls, Ryuk sets out on a journey of relentless growth, vengeance, and discovery. But power comes with a price, and the dual nature of his gift could either save humanity or destroy everything. This is a story of evolution, redemption, and defiance. Join Ryuk as he rises from nothing, building unshakable bonds with allies and carving his path in a world where strength is the only currency.

MTL - Imperial Beast Evolution (Fey Evolution Merchant)v7 Chapter 2718 Lin Yuan's dimensional wall!
 8.7M
4.5/5(votes)
ActionAdventureFantasyXuanhuan

This novel is also known as Fey Evolution Merchant

The shining stars and birds flying in the blue sky and white clouds, the fast shadow clouded leopards hunting and hunting in the vast grasslands, the acid eroded pythons hiding in the shadows of trees in the mottled rain forest, and the chalky Canglong dragon under the deep blue sea.

Lin Yuan found that he could allow infinite evolution of spirits, and continuously purify the bloodline.

Dust butterfly-stainless steel butterfly-emerald green butterfly-royal tourmaline butterfly.

This is a pure pet article, a world of beast masters.

- Description from MTL

To Kiss An IdolChapter 234 - The Broken House Rule
 2.5k
5.0/5(votes)
RomanceSlice Of LifeSupernatural

Running from her past, Nivritti joins a new job in South Korea as a Script Coordinator in K&Q Media Company. She works for a successful K-pop boyband. On her first day, she is kissed by the leader of that boy band. The problem is, she is five years older than him. Will that kiss grow into a relationship or will be forgotten by both of them?

*****

She tried to pull her wrists, but she failed. She looked at him and again tried to pull her hands but in vain.

“Yes, you do. You have been licking your lips since you started talking. I think it’s an unconscious gesture that you don’t know about,” informed Kyung-Soo.

“Will you please let go of my hands?” she pulled again but Kyung-Soo tightened his grip.

Without hearing her he continued, “and by distracting, I mean that I really want to hear what you have to say but because of your lips all I can think of is this…

He pulled her wrists pulling her close to him, moved one of his hands on her waist and another one on the back of her neck and softly placed his lips on hers and kissed her.