Previous chapter:
Chapter 16: First Time
Next chapter:
Chapter 18: Upgrades
PREVIEW
... nterior and exterior design. In the basement, a brown door appeared in the corner, the word 'Storage' slowly engraving itself into the surface. On the roof, newly materialized solar panels covered the entire backside.
Both the water and air purification systems received upgrades. A new water filtration system was installed in the boiler room, and new air filtration systems were installed in the house.
When looking at the walls and windows, one would think nothing had changed with ...
YOU MAY ALSO LIKE